Projects
Keyano College Ft. McMurray
Prime consultant for EMCS Upgrade project at the Clearwater Campus of the Keyano College in Fort McMurray.
North East Transit Garage - City of Edmonton
Client: Morrison Hershfield
Controls sub-consultant for the NETG which will be constructed as a LEED building. A new EMCS will be installed to control all of the mechanical equipment including heating, cooling, heat recovery ventilation. The NETG is a 72,600 square metre facility that will include bus maintenance bays, wash bays, re-fuel bays, an office building and a parkade.
Spring Gardens - Calgary Transit Technology Building
Client: Morrison Hershfield
The Transit Technology Building will be constructed as a LEED addition to the Calgary Transit Building. A new EMCS system, compatible with the existing buildings was designed to control the mechanical heating and ventilation systems.
Tofield Health Centre
Client: Alberta Health Services
This project involved replacing the existing Energy Management Control System (EMCS) at the Tofield Hospital while maintaining most of the existing pneumatic valves and pump controls and replacing most of the sensing devices.
Borden Park Natural Swimming Experience
Client: Morrison Hershfield
This project involved new construction of an outdoor swimming pool. A new EMCS was designed to control the mechanical heating and ventilation systems. This project also included design for a new industrial programmable logic controller (PLC) to control the pool equipment.
Stony Plain Balloon Launch
Client: Morrison Hershfield
Provision of a new EMCS for a new Environment Canada weather balloon helium fill control station. ebend engineering was responsible for the design of the EMCS for the heating and ventilation systems, alarming and fill controls.
Lac La Biche Health Centre EMCS Study
Client: Morrison Hershfield
A study was conducted to evaluate the functionality of the existing EMCS system and options for upgrading.
John E. Brownlee Building EMCS Study
Client: SNC Lavalin Operation & Maintenance
A study was conducted to generally evaluate the existing EMCS and the terminal box fans.
Jubilee Auditorium Heating Coil Valve Study
Client: Edon Property Management
A study was conducted of the existing heating coil valves and their EMCS controls.
Fort Saskatchewan Correctional Centre
Client: Morrison Hershfield
This project involved the EMCS controls associated with the upgrading of the wood working shop.
John E. Brownlee Building - Upgrade 4 Floors
Client: SNC Lavalin Operation & Maintenance
The latest project included replacement of the variable air volume terminal box controls and end devices on 4 floors of this 10 story office building.
John E. Brownlee Building - Upgrade 3 Floors
Client: Alberta Infrastructure
Replace the variable air volume terminal box controls and end devices on 3 floors of this 10 story office building.