top of page

Projects

Keyano College Ft. McMurray

 

Prime consultant for EMCS Upgrade project at the Clearwater Campus of the Keyano College in Fort McMurray.

North East Transit Garage - City of Edmonton

Client:  Morrison Hershfield

Controls sub-consultant for the NETG which will be constructed as a LEED building.  A new EMCS will be installed to control all of the mechanical equipment including heating, cooling, heat recovery ventilation. The NETG is a 72,600 square metre facility that will include bus maintenance bays, wash bays, re-fuel bays, an office building and a parkade.

 

Spring Gardens - Calgary Transit Technology Building

Client: Morrison Hershfield

The Transit Technology Building will be constructed as a LEED addition to the Calgary Transit Building.  A new EMCS system, compatible with the existing buildings was designed to control the mechanical heating and ventilation systems.

 

Tofield Health Centre

Client:  Alberta Health Services

This project involved replacing the existing Energy Management Control System (EMCS) at the Tofield Hospital while maintaining most of the existing pneumatic valves and pump controls and replacing most of the sensing devices.

Borden Park Natural Swimming Experience

Client:  Morrison Hershfield

This project involved new construction of an outdoor swimming pool.  A new EMCS was designed to control the mechanical heating and ventilation systems.  This project also included design for a new industrial programmable logic controller (PLC) to control the pool equipment.

Stony Plain Balloon Launch

Client:  Morrison Hershfield

Provision of a new EMCS for a new Environment Canada weather balloon helium fill control station.  ebend engineering was responsible for the design of the EMCS for the heating and ventilation systems, alarming and fill controls.

Lac La Biche Health Centre EMCS Study

Client:  Morrison Hershfield

A study was conducted to evaluate the functionality of the existing EMCS system and options for upgrading.

John E. Brownlee Building EMCS Study

Client:  SNC Lavalin Operation & Maintenance

A study was conducted to generally evaluate the existing EMCS and the terminal box fans.

Jubilee Auditorium Heating Coil Valve Study

Client:  Edon Property Management

A study was conducted of the existing heating coil valves and their EMCS controls.

Fort Saskatchewan Correctional Centre

Client:  Morrison Hershfield

This project involved the EMCS controls associated with the upgrading of the wood working shop.

John E. Brownlee Building - Upgrade 4 Floors

Client:  SNC Lavalin Operation & Maintenance

The latest project included replacement of the variable air volume terminal box controls and end devices on 4 floors of this 10 story office building.

John E. Brownlee Building - Upgrade 3 Floors

Client:  Alberta Infrastructure

Replace the variable air volume terminal box controls and end devices on 3 floors of this 10 story office building.

Please reload